Customization: | Available |
---|---|
After-sales Service: | Engineers Available to Service Machinery Overseas |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Brief introduction of our AAC/ALC production line:
Autoclaved aerated concrete plate and block production line:
Autoclaved aerated concrete board is cement, lime,siliceous waste residue, etc. as the main raw material and then according to the structural requirements configuration to add different amounts of steel bars, after high temperature and high pressure, steam curing, reaction to produce with porous crystalline autoclaved aerated concrete board, autoclaved aerated concrete board is light and porous new type of green environmental protectiion building materials, and has good light weight, high strength, thermal insulation, fire retardant, sound and noise, impermeability and moisture resistance and other superior properties.
Aerated autoclaved concrete block is the light weight and porous building material:
1.It can be made into any size of bricks and steel reinforced blocks:Such as 600*200*100mm,80*80*180mm,240*115*53mm,600*200*125mm and so on.They could be used in industry building and common building.In future,AAC block is an ideal substitute for traditional clay brick.
2.Capacity:from 50,000 cubic meters to 300,000 cubic meters per year.
The raw Material Proportion of AAC Block:
A.cement,lime,fly ash style aerated block raw material proportion | B.cement,lime,sand style aerated block raw material proportion | ||||
Name | Unit | Proportion | Name | Unit | Proportion |
Fly ash | % | 65-70 | Sand | % | 55-65 |
Cement | % | 6-15 | Cement | % | 10-20 |
Lime | % | 18-25 | Lime | % | 20-30 |
Gypsum | % | 3-5 | Gypsum | % | 2-3 |
Aluminum powder paste(600kg/m³) | 1/10000 | 8 | Aluminum powder paste(600kg/m³) | 1/10000 | 8 |
Water&material rate | 0.60-0.65 | Water&material rate | 0.65-0.75 | ||
Casting system | °c | 36-40 | Casting system | °c | 35-38 |
Aluminum mixing time | s | 30-40 | Aluminum mixing time | s | 30-40 |
Packing: Suitable for road or sea way, standard packing. Naked packing or stretch film packing or according to customers' requirements.
Hongfa Group Established in 1990.
A leader developer& Manufacturer of Construction Material Machinery.
Main business Range & Products:
Lightweight Panel Production Line, AAC Block Production Line, Full Automatic Concrete Block Production Line, Artificial Quartz Plate Production Line, Concrete Pipe Machine, Concrete Tile Machine, Concrete pipe machine, Bidirectional Hydraulic Brick Maker, Mining Machinery, Concrete Batching plant, Stereo Parking Equipment, etc.
Hongfa Strengths
1.How can I trust the machines quality?
Our products passed ISO9001-2000 and CE identifications, and we making machines for 27 years,with full experience,updating technical idea and application.Furthermore our machines have been exported to more than 96 countries and always have a good reputaion from our oversea customers.We will do fully test our products before shipment,make sure every equipment work well when they come to your hand.
2.When do you delivery the goods?
Normally 20 days after receipt of deposit and moulds confirmation from Buyer.
3.What about the payment?
30% as down deposit by T/T ,70% as the balance paid by T/T before loading(L/C is also acceptable).
4.Does the price include the mould?
Yes,the above price includes one mould for free, extra moulds should be paid according to design.
Do not hesitate to contact with us! Welcome to visit us to see Lightweight Precast Concrete Wall Panel Making Machine, Sandwich Wall Panel Production Line, Fiber Cement Wall Board Machinery running in our factory!
Foreign Trade Dept. : Hyde Tang (Send me inquiry)
Guangxi Hongfa Heavy Machinery Co., Ltd.
Factory add.: Yilingyan Industrial Zone, Nanning city, Guangxi province, China