Product Description
HONGFA Sand Fly Aac Machine Aac Block Machine Production Line Aac Concrete Block Machine
Hongfa has 80 production line plant abroad AAC (Autoclaved aerated concrete) block Main raw materials of AAC are siliceous material (sand, fly ash and Silicon tailings) and Calcium materials (lime and cement) mixed with foaming agent (aluminum powder).
Raw material preparation for AAC plant:
AAC block raw material required performance:
Fly ash: A lot has been said about this raw material in this Project Profile itself. But this Raw material is freely available in
Thermal Power plants. There are no taxes on this item whatsoever. Transportation charges are only to be attended by the
entrepreneur.
Sand (65-70%): The core raw material of AAC product; the main resource of silica-aluminum components; correspond with JC409-91,the clay should less than 4%.
Lime(12-20%): One of the main raw materials of fly ash AAC; the main effect is to provide efficient calcium oxide with cooperation of cement making calcium oxide react with SiO2, Al2O3 in hot water then to produce calcium silicate hydrate. Therefore, lime is also the main resource of strength. Effective calcium oxide of lime should not less than 65%, over 80% is perfect and should accord with JC/T621-1996.
Cement(8-10%): This Project aims to utilize OPC cement as main binder material. It will give faster strength to the bricks,
besides giving improved consistent quality. It also ensures a better cost effectiveness for the same. Using OPC will be a
standardized practice. The other prime advantages of using OPC (compared to other binders) is it's easy availability locally
through nationwide Retail Network of Cement Companies.
Gypsum(1-2%): Gypsum is the foaming regulator in AAC which dispels quicklime and postpones slurry's densification.CaSO4 should be more than 70%.
Aluminum Podwer(0.074%): It is the forming agent type and recommendation for supply depend on raw materials and mix formula:A lot
has been said about this raw material in this Project Profile itself. But this Raw material is freely available in Thermal Power
plants. There are no taxes on this item whatsoever. Transportation charges are only to be attended by the entrepreneur.
Main Equipment For AAC Line
Raw material dealing
Put the fly ash or sand into the ball mill to mill via the conveyor belt, after milling, put the slurry into the slurry storage tank by slurry pump.
Batching, mixing and pouring process
The lime, cement will convey by conveyor to the dry powder measure scale to scale separately. The slurry convey by slurry pump then to the automatic scale;the power and slurry put into the mixer,pouring into the mould.
Curing process
After slurry pouring into the mould, put the mould box into the curing room with 50~70ºC. After 2-3 hours curing, the blocks become soft solid and ready for cutting.
Cutting process
Cutting size can be adjusted flexibly, with 0 broken rate.
Aerated autoclaved process
Finished cutting using semi-product crane carry to the front of autoclave grouped, hoisting machine or dragger will drag steam trolley into autoclave to steam,it need 6-10 hours.
Finished block dealing process
After 6-10 hours, finished products come out of autoclave, with separting machine to separate blocks layer by layer.
Packing process
Using finished block carry hanger clamp the finished product to package line on wooden pallets,after package, then by forklift transport the finished products to piled yard according to specifications to stack.
Packaging & Shipping