Customization: | Available |
---|---|
After-sales Service: | on Site Installation and Training |
Warranty: | 1year |
Still deciding? Get samples of US$ 1000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Features of Organic fertilizer production line 1. Low energy consumption;
2. Centralized control, low labor: 1-2 workers;
3. High Efficiency;
4. Low moisture content of the fertilizer; 5. Low consumption of fermenting agent. |
Capacity
|
5 - 50 cubic meters / day
|
Systems in A Production Line
|
Main treatment system;Batching & conveying system; Packing system.
|
Deodorization Method
|
Biological deodorization
|
Fermentation Chamber Volume
|
10 - 100 cubic meters
|
Equipment parameters
|
|||||
Item
|
HF-5
|
HF-10
|
HF-20
|
HF-30
|
HF-50
|
Host size
|
9*2*2.7 M
|
12*2.4*3.4 M
|
15*2.4*4.1 M
|
17*2.4*5 M
|
17*5.2*5.5 M
|
Overall volume of fermentation chamber
|
10 m2
|
20 m2
|
40 m2
|
60 m2
|
100 m2
|
Volume of batching machine
|
1.0 m2
|
1.0 m2
|
1.8 m2
|
1.8 m2
|
1.8 m2
|
Batching machine
|
4.4kw
|
4.4kw
|
4.4kw
|
4.4kw
|
4.4kw
|
Heat recovery fan
|
1.5kw
|
1.5kw
|
3kw
|
3kw
|
4kw
|
Oxygen supply machine
|
1.5kw
|
1.5kw
|
3kw
|
3kw
|
4kw
|
Feed conveyor belt
|
2.2kw
|
2.2kw
|
3kw
|
3kw
|
3kw
|
Discharge inclined belt
|
1.5kw
|
1.5kw
|
1.5kw
|
1.5kw
|
3kw
|
Discharge belt
|
0.75kw
|
1.1kw
|
1.1kw
|
1.5kw
|
1.5kw
|
Deodorization method
|
biological deodorization
|
biological deodorization
|
biological deodorization
|
biological deodorization
|
biological deodorization
|
Spray latent deodorization
|
1.5kw
|
1.5kw
|
2.2kw
|
2.2kw
|
4.4kw
|
Host weight
|
8t
|
12t
|
16t
|
18t
|
36t
|
Processing capacity
|
5 m2
|
10 m2
|
20 m2
|
30 m2
|
50 m2
|
Installation dimension
|
27*5*3.5 m
|
30*5*5.5 m
|
33*5.5*5.4 m
|
31*6*6 m
|
44*8.5*6 m
|
After the biological strains independently developed by Hongfa Environmental Protection are combined with the feces, the feces are put into the box on the same day, and the odor can be deodorized on the same day. Based on the combination of dynamic and static high-temperature fermentation process, while eliminating eggs and sterilizing, the feces undergo high-temperature aerobic fermentation in the equipment for 1-2 days, and after being placed, organic fertilizer meeting the national organic fertilizer standard will be produced.
The Wall Panel Making Machine and Production Line Equipment will be well prepared and proper packaged with Plastic Film Wrapping.All process are accordance with international standard, which ensure the machines and equipment in the container are seaworthy.
About Hongfa Group